You are not authorized to access this page. Log in with your UVic account to access restricted material, or email speccoll@uvic.ca to request access.
In-progress construction of the new bridge over the Tombԑ River, Sabiye, 2016
PublicConstruction of a new bridge to replace a long-used one over the Tombԑ River near Sabiye on the road from Menji to Ahenkro began in the 2010s. Its abutments are visible here, view to the north. Construction had stalled by 2016. Sabiye, 19 June, 2016.
- 8.063784, -2.355361
- Dr. Ann B. Stahl
- Digital image
- 2016
| Thumbnail | Title | Date Uploaded | Visibility | Actions |
|---|---|---|---|---|
|
ABS_2016-06-19_Sabiye_NewBridgeSite_1810.jpg | 2019-02-26 | Public | Download |
