In-progress construction of the new bridge over the Tombԑ River, Sabiye, 2016
Construction of a new bridge to replace a long-used one over the Tombԑ River near Sabiye on the road from Menji to Ahenkro began in the 2010s. Its abutments are visible here, view to the north. Construction had stalled by 2016. Sabiye, 19 June, 2016.
- 8.063784, -2.355361
- Dr. Ann B. Stahl
- Digital image
- 2016