You are not authorized to access this page. Log in with your UVic account to access restricted material, or email speccoll@uvic.ca to request access.
Downstream from Bui Dam construction site, 2009
PublicIn the foreground, right, work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Grating of the mountain slope is underway. Beyond that (right center) buildings associated with the Chinese operational site are visible. The braided channel of the Black Volta River downstream from the dam site is center frame. Bui Dam site, 7 July, 2009.
- 8.279095, -2.236098
- Dr. Ann B. Stahl
- Digital image
- 2009
| Thumbnail | Title | Date Uploaded | Visibility | Actions |
|---|---|---|---|---|
|
ABS_2009-07-07_Bui_DamSiteDownstream_0885.JPG | 2019-04-19 | Public | Download |
